Malaysia

Penang wants ‘brakes’ on rainwater run-off after fresh floods

State govt to propose city councils make system’s installation in private driveways, public walkways a must

Updated 5 years ago · Published on 29 Sep 2021 8:00PM

Penang wants ‘brakes’ on rainwater run-off after fresh floods
Exco Phee Boon Poh says Penang will also work on enlarging Sg Jelutong. – CM’s Office pic, September 29, 2021

by Ian McIntyre

GEORGE TOWN – The Penang government will propose that its two city councils make it mandatory for private driveways and public walkways to be installed with an “interlocking brakes” system to curb rainwater run-off, to prevent flash floods.

Exco Phee Boon Poh said this is part of the state’s efforts to mitigate the effects of climate change, which has caused more severe rain that ends up damaging properties and endangering lives.

The said system acts as a shield against excess run-off from surfaces, he told The Vibes.

“The interlocking brakes can prevent tremendous water run-off on surfaces. They can then be released automatically once the earth is able to absorb the excess water.”

Through sensors, the system can also be linked to river levels, he said.

He said the concept should be made compulsory for all future development projects in Penang, as the pattern of heavy rainfall is expected to continue due to global warming.

It should be enforced especially for hillside projects and farms built on slopes, so as to guard against erosion, which triggers landslides, said Phee.

He said Penang will also work on enlarging Sg Jelutong.

His comments come after the state was again inundated with floods last night. There were also at least two minor landslides in Tg Bungah here.

Meanwhile, the Penang Water Supply Corporation (PBAPP) urged motorists to avoid the winding road on the hill where the Guillemard Reservoir in Tg Bungah is located, following a landslide in the area.

A wide section of the slope, measuring about 10m in height and 9m in width, collapsed some 50m from the entrance of the reservoir about 9.30pm yesterday, scattering debris along a section of the route.

A 1.5km section of the road was temporarily closed today for emergency clearing works by Public Works Department and PBAPP personnel. – The Vibes, September 29, 2021

Related News

Community / 10h

Paya Terubong landslide: Resident writes to 15 ADUN to seek ban on hillslope development

Malaysia / 2d

Flash floods, landslides: Penangites asked to be on alert

Malaysia / 3d

Air Itam - Tun Dr Lim Chong Eu Expressway expected to be ready by April next year

Malaysia / 4d

Penang to seek greater clarification over Waze ban

Places / 6d

Penang makes National Geographic list of top 25 cities worldwide to visit

Community / 1w

Penang: Ratepayers Association calls for immediate solution to worsening congestion

Spotlight

Malaysia

Mahathir’s RM150m defamation suit against Anwar faces uncertainty

Malaysia

Son shocked by father’s fatal hacking in FELDA settlement

Malaysia

Election Commission to meet on Nov 6 to set key dates for Sarawak polls

Malaysia

PH says final 72 hours could decide Melaka election outcome despite 70-80% target

Malaysia

RM3.28m Govt aid reaches 164 Indian community places of worship

Malaysia

Ismail Lasim holds off on new Negeri Sembilan exco appointments pending court decision

By Alfian Z.M. Tahir

Malaysia

Battersea project’s high upfront cost led to losses for Malaysian investors, says Anwar

Malaysia

Ras Adiba condemns unauthorised entry into missing TV host Zalina Azman’s home

You may be interested

Malaysia

MMEA officer killed after boat hits coastal wall during suspected migrant chase in Perlis

Malaysia

Son shocked by father’s fatal hacking in FELDA settlement

Malaysia

RM1,000 aid for taxi drivers nationwide, not just in Melaka – Anthony Loke

Malaysia

FELDA settler killed as axe-wielding suspect goes on rampage in Kota Tinggi (UPDATED)

Malaysia

Lim Guan Eng trial: Prosecution closes case on four charges after 38 witnesses

Malaysia

Ras Adiba condemns unauthorised entry into missing TV host Zalina Azman’s home

Malaysia

Battersea project’s high upfront cost led to losses for Malaysian investors, says Anwar

Malaysia

Seventeen-year-old boy falls from balcony of his home in Kundang