Malaysia

All 67 PPRs, PAs in KL to get new elevators, work to start early 2022: Ismail Sabri

Govt is also looking into insufficient parking spaces issue at these areas

Updated 4 years ago · Published on 16 Oct 2021 12:39PM

All 67 PPRs, PAs in KL to get new elevators, work to start early 2022: Ismail Sabri
Work on the the elevator replacement at PPRs and PAs in Kuala Lumpur will commence once the contract procurement process is completed, notes Prime Minister  Datuk Seri Ismail Sabri Yaakob. – File pic, October 16, 2021

KUALA LUMPUR – All 67 People’s Housing (PPR) and Public Housing (PA) Projects in Kuala Lumpur are expected to be installed with new elevators in two years’ time, said Prime Minister  Datuk Seri Ismail Sabri Yaakob.

He said KL City Hall has allocated RM127 million for replacement of old lifts at the PPRs and PAs.

Ismail Sabri said work on the elevator replacement is expected to begin early next year after the contract procurement process is completed.

“In any PPR project, lifts are essential to allow residents to move about, and the government views this problem (old and damaged lifts) seriously.

“I hope the procurement process can be expedited and the time taken (for lift replacement) could be one to two years, depending on the contract and the number of blocks at each PPR,” he told a press conference after visiting Seri Perak PA here, today.

Also present was Federal Territories Minister Datuk Seri Shahidan Kassim. 

Ismail Sabri said of the total allocation, RM8.4 million will be channelled to the Seri Perak PA, which has been in existence for 35 years, for the replacement of 14 elevators at seven blocks.

In addition, he said DBKL has also allocated RM1.8 million for electrical wiring at the housing project.

The prime minister said under the Strategic Programme to Empower the People and Economy, the government has allocated RM15 million for the upgrade and maintenance of facilities such as drains, sidewalks, playgrounds and futsal courts at all PPRs and PAs in Kuala Lumpur. 

On the issue of insufficient parking spaces in PPR and PA areas, Ismail Sabri said the government is looking into several ways to solve the problem and among the solutions proposed is to build a multi-storey car park. – Bernama, October 16, 2021

Related News

Malaysia / 1w

Ismail Sabri charged over assets declaration, pleads not guilty

Malaysia / 4w

Former PM Ismail Sabri's charge deferred to Aug 27

Malaysia / 3mth

Couple receive rude surprise when hospital hands them ‘wrong’ baby

Opinion / 3mth

'Brickfields didn’t fail. We failed it'

Malaysia / 9mth

Kuala Lumpur also hit by floods, nearly 14,000 victims nationwide

Malaysia / 9mth

Penang: Over a hundred PPR residents face possible eviction

Spotlight

Malaysia

Puteri Umno distances itself from viral Threads post

By Alfian Z.M. Tahir

Malaysia

MACC drops orange detention attire for court remand cases after PM’s call

World

Man jailed six years for keeping Indonesian woman as slave in Melbourne home

Malaysia

Emergency declared in Serian as haze reaches hazardous levels (UPDATED)

Malaysia

Haze in Serian enters emergency phase

Malaysia

Death sentence for deaf, mute man who killed family of four upheld

Malaysia

Retired army officer with Datuk title charged with alleged sexual assault of golf caddie

Heritage

Penang first state to recognise Hungry Ghost Festival, cemeteries as heritage

You may be interested

Malaysia

Anwar holds key to revival of two constitutional reform bills

Malaysia

Anwar: ‘Government stable, GE16 timing up to me’

Malaysia

Anwar: Children’s smiles, dreams are Malaysia’s future (video)

Malaysia

'The life and spirit of the cafe is gone', Secangkir Café, Kuantan closes today

Malaysia

Emergency declared in Serian as haze reaches hazardous levels (UPDATED)

Malaysia

Parliament must turn demographic shifts into laws, budgets, action, says Johari

Malaysia

Serian air pollution hits hazardous level with API reading of 495

Malaysia

IT officer loses RM20,000 in TikTok SPayLater scam