Malaysia

Gua Musang-Kuala Krai road users fear canvas on slopes may collapse

Motorists fret over safety as official assures periodic monitoring of area being done

Updated 3 years ago · Published on 16 Jan 2023 5:45PM

Gua Musang-Kuala Krai road users fear canvas on slopes may collapse
Gua Musang senior nature control officer Zaharizam Johny assures that the contractor for construction work on the Gua Musang-Kuala Krai route has a certified environmental consultant regulating the project. – Bernama pic, January 16, 2023

GUA MUSANG – Road users on the Gua Musang-Kuala Krai route near Kem Semur here have expressed concern over the broken plastic canvas covering the slopes on both sides of the road.

Checks today found that the slopes are part of the Central Spine Road construction work being carried out by the developer.

Ammar Ezani Ahmad, 27 said the road was his main route to his workplace in Bandar Utama.

“If possible, I would like to avoid this route, because every time I drive through this area, I am afraid and want to drive faster to pass the area quickly.

“I cannot imagine the soil on the hill collapsing and falling on the road while you are passing through,” he told reporters here today. 

Nur Shahirah Ismail, 36, claimed that the plastic sheets were at risk of collapsing at any time.

“It is worrying when we see the condition of the slopes on both sides of the road, not only because of the old and rotten cover, but also because of the uncertain weather conditions, which make us worried to travel on the road.

“I urge those responsible to monitor this project as much as possible and keep the safety of the people in mind,” she said.

Meanwhile, Gua Musang senior nature control officer Zaharizam Johny said that periodic monitoring was being carried out to ensure that safety was prioritised, adding that a notice was issued to the contractor to cover the exposed slopes.

“The contractor has been advised on safety aspects and management. The contractor also has a certified environmental consultant regulating the project in question,” he said. – Bernama, January 16, 2023

Related News

Malaysia / 3w

Income of RM7,000 in Kelantan, Kedah makes one part of T20 group

Malaysia / 2mth

RTD denies department vehicle was the cause of Tanah Merah accident

Malaysia / 4mth

First gender transition case recorded in Kelantan Syariah Court

Education / 4mth

UMK shapes accountants of the future with strong social, environmental responsibility

Malaysia / 6mth

Man arrested for molesting teenage girl at flood evacuation centre

Malaysia / 6mth

Kuala Lumpur also hit by floods, nearly 14,000 victims nationwide

Spotlight

Malaysia

Anwar congratulates Modi on becoming India's longest-serving elected PM

Malaysia

Missing jewellery: Rosmah ordered to pay RM67.5 million

People

Malay kampongs in Bangkok: Echoes of southern heritage in Thailand’s capital

Opinion

Johor MB’s exclusionary rhetoric betrays the people, exposes UMNO’s political hypocrisy

Malaysia

Johor and NS polls first major test of post PAS-Bersatu political order

Malaysia

Claimed installation of 12th N. Sembilan ruler invalid - Pengelola Bijaya Diraja

Malaysia

4WD driver who drove backwards on highway nabbed, positive for drugs (video)

By Ian McIntyre

Malaysia

Seven in ten Malaysian workers earn RM5k or less - economist

You may be interested

Malaysia

Bersatu vows to remain in Perikatan Nasional after PAS ends political ties

Malaysia

Economic strains from West Asia crisis must not fracture national unity, warns Fadillah

Malaysia

Authorities previously raided viral ‘illegal flat’ linked to Rohingya settlement claims

Malaysia

Missing jewellery: Rosmah ordered to pay RM67.5 million

Malaysia

Fiscal deficit target under pressure as surging subsidy costs test Malaysia’s consolidation plans

Malaysia

PAS-UMNO meeting a positive step in line with new political dynamics – Zahid

Malaysia

Fatal road accidents claim at least 16 lives in little more than a week

Malaysia

PAS ends political cooperation with Bersatu