Malaysia

Six stations on Ampang-Sri Petaling LRT line closed from April 2

Trains between Bandaraya, Sentul Timur to be taken out of service for safety reasons

Updated 1 year ago · Published on 30 Mar 2023 11:59PM

Six stations on Ampang-Sri Petaling LRT line closed from April 2
To meet the needs and facilitate the journeys of affected commuters, Rapid Rail Sdn Bhd will provide free LRT 13 and LRT 14 express bus services from Sunday, in addition to the existing LRT 11 bus service. – SAIRIEN NAFIS/The Vibes file pic, March 30, 2023

KUALA LUMPUR – Operations of six LRT stations on the Ampang-Sri Petaling line, involving the Bandaraya, Sultan Ismail, PWTC, Titiwangsa, Sentul, and Sentul Timur stations, will be suspended from Sunday (April 2).

Rapid Rail Sdn Bhd said this is because the trains used for services between the Bandaraya and Sentul Timur stations no longer meet the operational criteria and have to be taken out of service for safety reasons.

“This is due to the structural and runway damage near the Bandaraya LRT station, which has resulted in trains not being able to return to the Ampang LRT depot to undergo maintenance works since January 27.

“To meet the needs and facilitate the journeys of affected commuters, Rapid Rail will provide free LRT 13 and LRT 14 express bus services from Sunday, in addition to the existing LRT 11 bus service,” it said in a statement today.

It said this will involve 40 buses at a frequency of between 10 and 15 minutes during peak periods, depending on traffic conditions.

In addition, Rapid Rail said that from April 2, the LRT 9 and LRT 10 bus services will also be terminated.

“To facilitate the journey, all bus services will use the special bus lanes provided. Rapid Rail apologises for any inconvenience faced by commuters. We thank and appreciate our passengers’ patience,” it said. – Bernama, March 30, 2023

Related News

Malaysia / 1mth

Penang gets nod for construction of 26 km LRT system

Opinion / 2mth

Reconsider Penang LRT: Consider better, cheaper, faster options – Lim Mah Hui

Malaysia / 3mth

Penang’s LRT alignment headed for revamp as Transport Ministry takes over

Malaysia / 5mth

Death on LRT track: victim jumps as train approaches

Malaysia / 7mth

LRT passenger earns internet ire for taking shoes off

Malaysia / 9mth

Elephants are banned from LRT trains, clarifies RapidKL in jest

Spotlight

Malaysia

Serdang Heart Centre to see repairs next month

Malaysia

2 plead guilty for trying to trespass into Istana Negara

Malaysia

Police record statements from 2 witnesses in Teresa Kok death threat case

Malaysia

Sabah cabinet to address state lawyer’s alleged blunder over 40% revenue

By Jason Santos

Malaysia

PKR tells Sarawak to hold non-essential, mega projects, build basic infrastructure

By Stephen Then

Malaysia

Cops investigating if police station attacks, palace trespass attempt linked

You may be interested

Malaysia

Shoppers less spending in malls, says group

By Noel Achariam

Malaysia

Sibu woman killed in morning blaze

By Desmond Davidson

Malaysia

Cops investigating if police station attacks, palace trespass attempt linked

Malaysia

Private hospitals willing to take urgent surgery cases from Serdang Heart Centre

Malaysia

PKR tells Sarawak to hold non-essential, mega projects, build basic infrastructure

By Stephen Then

Malaysia

9-day trial for Israeli charged with gun trafficking, bullet possession

Malaysia

One dead, 30 injured as SIA flight hit by turbulence

Malaysia

Hajiji dodges questions on state’s legal blunder in 40% revenue claim case

By Jason Santos