Malaysia

RM5.6 bil allocated for dual-function reservoir, Langat 2 treatment plant: Tuan Ibrahim

Projects to increase Selangor’s water supply reserve margin to over 15%

Updated 3 years ago · Published on 29 Sep 2022 7:05PM

RM5.6 bil allocated for dual-function reservoir, Langat 2 treatment plant: Tuan Ibrahim
Environment and Water Minister Datuk Tuan Ibrahim Tuan Man says that RM5.6 billion has been allocated to construct a dual-function reservoir meant for raw water supply and flood mitigation of Sg Klang-Sg Rasau and for Phase 2 of the Langat 2 Water Treatment Plant. – The Vibes file pic, September 29, 2022

PUTRAJAYA – The government allocated RM5.6 billion to construct a dual-function reservoir meant for raw water supply and flood mitigation of Sg Klang-Sg Rasau and for Phase 2 of the Langat 2 Water Treatment Plant.

Once completed, the two projects will increase Selangor’s water supply reserve margin to over 15% and supply 1.4 million litres of water daily for 467,000 account holders, Environment and Water Minister Datuk Tuan Ibrahim Tuan Man said.

He said the projects that will kick off in January are scheduled to be completed within five years with the cooperation of the Selangor government. 

“The reservoir will be able to provide at least three months of water supply should there be any incidences of contamination at water treatment plants,” he told a media conference after chairing a special committee meeting on the implementation of the projects here today. 

Tuan Ibrahim said the reservoir will also serve as a flood control facility during floods. 

“It is capable of extracting as much as 26 million m3 of water from Sungai Klang during peak flow that would cause an estimated drop of up to 500mm downstream,” he said.

He said the government has implemented various projects to reduce the risk of flooding in the Klang Valley, including increasing the number of flood warning sirens, web camera stations, water level and rain monitoring centres and increasing the lifespan of bunds. 

“Flood warning sirens were increased from seven to 33, web camera stations from 34 to 53, water level monitoring centres from 13 to 41, rain monitoring centres (30 to 53) and the lifespan of bunds increased from 100 to 200 years,” he said, adding that the project has been completed with a cost of RM66 million. – Bernama, September 29, 2022

Related News

Malaysia / 2y

PAS will not work with Umno as long as Zahid is president

Malaysia / 2y

Women hit out at Tuan Ibrahim over polygamy statement

Malaysia / 2y

Polygamy – Tuan Ibrahim’s solution to rising number of single women

Malaysia / 3y

‘No chance to ask questions or failure to submit queries?’

Malaysia / 3y

‘Perikatan leaders can’t ask questions even if they attended Parliament’

Malaysia / 3y

Perikatan to meet Fadillah on opposition MP allocations

Spotlight

Malaysia

Long Lellang helicopter crash: Remains of 5 victims to be returned to families today

Malaysia

UMNO-PAS relations. Are things as rosy as it seems?

Malaysia

‘The bridge has been burned’: UMNO-PH ties face growing strain as attacks turn increasingly open

By Alfian Z.M. Tahir

Malaysia

20 years ago, woman bought gold bangle for RM2k, now sold for RM18k

World

Nepal flood survivor rescued after 10 days trapped in hydropower tunnel

Malaysia

Anwar, Putin agree on mechanism to fast-track Malaysia-Russia deals

Malaysia

Selangor declares Oct 25 public holiday for Sultan’s Silver Jubilee

Malaysia

Najib’s pardon application deferred

By Alfian Z.M. Tahir

World

Magnitude 4.1 tremor hits southern Lebanon after Israeli blasts target Hezbollah tunnels

Education

UiTM probes alleged sale of hostel room placements at Puncak Alam

By Alfian Z.M. Tahir

You may be interested

Malaysia

UMNO calls for probe into AI operation targeting Malaysian voters

Malaysia

Anwar tells PKR Sabah to close ranks, gear up for next GE

Malaysia

Elderly man dies after becoming trapped in century-old Kelantan house fire

Malaysia

Ab Rauf: Melaka voters to decide state government’s strategic partners

By Alfian Z.M. Tahir

Malaysia

GE16: BN-PN may get the Malay votes, but Sabah, Sarawak remain kingmakers

By Alfian Z.M. Tahir

Malaysia

Left lane closed at Menora Tunnel landslide site as safety precaution

Malaysia

Malaysia seeks Nepal deal to establish status of 55 Malaysians still unaccounted for

Malaysia

Bersama accuses government of targeting activists through AMLA measures