Malaysia

Two new schemes implemented to alleviate water shortage in KK: Sabah govt

State expects Telibong I, II treatment plants to resolve supply issues in Tuaran, Tamparuli

Updated 3 years ago · Published on 25 Oct 2022 7:44PM

Two new schemes implemented to alleviate water shortage in KK: Sabah govt
Chief Minister Datuk Seri Hajiji Md Noor inspects the Telibong I water treatment plant in Tamparuli, Tuaran, which will have its capacity increased to 80 mld following the completed urgent water supply scheme. – Bernama pic, October 25, 2022

by Jason Santos

TUARAN – The Sabah government has implemented two urgent water supply scheme (UWSS) projects at the Telibong I and II water treatment plants as an immediate measure to address water shortage faced in the northern parts of Kota Kinabalu.

Chief Minister Datuk Seri Hajiji Md Noor in a statement said the first UWSS undertaken by Jetama Sdn Bhd at the Telibong I water treatment plant in Tamparuli here was completed on October 12 and will be fully operational by December.

“Another UWSS project is currently being done at the Telibong II water treatment plant, which is expected to be completed between February and March next year,” he said after a briefing and site visit to the Telibong I water treatment plant today.

The Telibong I UWSS project involved the construction of a treatment plant with a capacity of 5 mld to boost the plant’s capacity to 80 mld.

It will be fully operational once the installation of a 1.8km distribution pipe is completed.

Water Department director Baharuhom KK Sogon in his briefing to the Sabah chief minister earlier said that the Telibong I UWSS project will provide additional water supply to 25,000 residents to address the water supply problem in Tuaran and Tamparuli.

It would also allow for excess water supply to be distributed to households in Menggatal and Telipok.

He said the Telibong II UWSS project would boost water supply capacity at the treatment plant by another 10 mld.

He added these plants were expected to improve water supply in the northern parts of Kota Kinabalu as it would increase water production to 15 mld.

In the meantime, Hajiji said the Water Department has been asked to increase scheduled water rationing in areas badly affected by water shortages.

The state government is currently conducting a six-month feasibility study to build a 1,000 mld water treatment plant under the Kota Kinabalu Water Supply Phase III as a long-term measure to solve the water supply shortage.

Also present were State Science, Technology and Innovation Minister Datuk Yakub Khan, state secretary Datuk Seri Safar Untong, State Assistant Works Minister Datuk Limus Jury and State Assistant Tourism, Culture and Environment Minister Datuk Joniston Bangkuai. – The Vibes, October 25, 2022

Related News

Malaysia / 3d

Sabah does not agree to 200-litre diesel quota, forms special committee - Masidi

Malaysia / 1mth

Tsunami alert: Stay calm and obey instructions from the authorities – Hajiji (video)

Malaysia / 1mth

Sabah embarks on five-year initiative to document multiethnic heritage - Hajiji

Malaysia / 1mth

Anwar - Sabah's special grant interim payment increased from RM600m to RM1.5b

Malaysia / 1mth

Anwar to clarify Sabah 40 pct entitlement talks tomorrow

Malaysia / 1mth

Sabah: GRS confident government will agree to review revenue entitlement rate 

Spotlight

Malaysia

PH: PAS-UMNO unity narrative an old political script that failed before

By Alfian Z.M. Tahir

Malaysia

MACC investigator defends land transfer findings in Guan Eng corruption trial

Malaysia

Guan Eng meets PM over greater monetary relief for MSMEs

By Ian McIntyre

Malaysia

Sentiments of Malay voters in Negeri and Johor cannot be compared – Aminuddin

Culture

Penang Museum officially ‘reopened’ after delicate touch-ups

By Ian McIntyre

Malaysia

Former minister, Idris Jala, diagnosed with stage three lung cancer

Malaysia

KBS studying possibility of Sepang replacing Bahrain as F1 host

Malaysia

PM rejects antisemitism claims, says Malaysia opposes Israel’s actions, not Jewish people

Malaysia

Anwar: Malaysia to keep engaging US over 10% tariff as trade talks continue

You may be interested

Malaysia

Ministry boosts RE drive with 127.59mw Pasir Mas solar projects as green transition gains momentum

Malaysia

'No UMNO' - Muhyiddin rejects call to dissolve Bersatu, vows party will continue political struggle

Malaysia

70-year-old man arrested over alleged political flag removal in Seremban

Malaysia

Immigration crackdown intensifies as 109 foreigners detained in Ampang

Malaysia

Eleven face court over alleged membership in organised crime group ‘Geng Vinod’

Malaysia

"Malicious claims": Loke dismisses MB speculation, says Aminuddin remains PH’s only choice

Malaysia

Form four student killed after car crosses into opposite lane in Setiu crash

Malaysia

Court orders police to probe foreign management institute