Malaysia

Govt replacing over 400km dilapidated pipes in Kelantan: Tuan Ibrahim

Four newly-built water treatment plants have started operating with 44mld capacity, he adds

Updated 3 years ago · Published on 12 Nov 2022 6:37PM

Govt replacing over 400km dilapidated pipes in Kelantan: Tuan Ibrahim
Datuk Seri Tuan Ibrahim Tuan Man says the Environment and Water Ministry has started replacing dilapidated pipes stretching over 400km throughout Kelantan with an allocation of RM218 million. – The Vibes file pic, November 12, 2022

KOTA BARU – The Environment and Water Ministry has started replacing dilapidated pipes stretching over 400km throughout Kelantan with an allocation of RM218 million, said Datuk Seri Tuan Ibrahim Tuan Man.

He said out of that total, 106.2km of dilapidated asbestos cement (AC) type pipes have been replaced in stages.

“The total length of dilapidated AC pipe replacement in Kelantan is estimated to be 4,491km, which can be used for 35 to 40 years, as the water pipes in Kelantan are over 40 years old.

“We are currently replacing dilapidated pipes in several areas to ensure that clean water can be supplied to the people of Kelantan,” he said at the Perikatan Nasional’s daily press conference here today.

Tuan Ibrahim added that there are four newly-constructed water treatment plants in Kelantan that have started operating with a capacity of 44mld.

“Among the plants that started operating are Kg Teluk, Kota Baru with a capacity of 30mld, Mini Telok Mesira plant, Bachok with a capacity of 2mld.

“When all the new plants are operating at full capacity, the water supply coverage rate in Kelantan is expected to be increased from 73.1% to more than 80%,” he said.

He said the ministry will also build four more new water treatment plants in Kelantan which are expected to be fully completed in 2025 with an allocation of RM 664.8 million.

The four new plants are Chicha Phase 2, Tg Mas, Bukit Chupak and Tok Bali. – Bernama, November 12, 2022

Related News

Malaysia / 1w

RM250m federal allocation raises hopes for long-delayed Kota Bharu bus terminal

Malaysia / 2w

Why was a Pasir Mas family forced to turn to a Penang MP for a wheelchair?

Community / 2w

Sim reaches out to man who needed a wheelchair in Kelantan

Malaysia / 3w

LPT3 row puts Kelantan’s infrastructure priorities under scrutiny

Opinion / 1mth

Can Malaysians trust PAS?

Malaysia / 2mth

Malaysians urged to rethink travel to southern Thailand after 51 violent incidents

Spotlight

Opinion

Can Najib break Madani?

World

Trump offers UFC CEO the position of Press Secretary

Malaysia

Building a great nation begins with happy families, says Anwar

Malaysia

Anwar should sack BN ministers who are not aligned with him – Muhyiddin

Malaysia

AGC rejects claims of defying King’s decree on Najib

Malaysia

Deepavali: Selangor Sultan calls on Malaysians to strengthen unity, reject hatred

Malaysia

If there were still obstacles, why accept the RM50m payment, asks Najib’s daughter

Malaysia

Where did UMNO's RM50 million payment for Najib's release come from?

By The Vibes Says

You may be interested

Malaysia

MOH investigates food poisoning complaints linked to bread product

Malaysia

Foreign suspect held within 24 hours over fatal stabbing of elderly man in Sabah

Malaysia

24 families lose homes in Kanowit longhouse fire

Malaysia

Building a great nation begins with happy families, says Anwar

Malaysia

Agong: Challenging Najib’s house arrest order amounts to defying royal decree

By Alfian Z.M. Tahir

Malaysia

Little activity at Najib’s Langgak Duta home as house arrest remains uncertain

Malaysia

Deepavali: Selangor Sultan calls on Malaysians to strengthen unity, reject hatred

Malaysia

Chery denies component failure after Tiggo Cross loses wheels in NKVE crash