Malaysia

‘Toll-free LTU to speed up KL-Kelantan travel when completed in 2026’

Deputy works minister says expressway expected to serve two mil road users

Updated 3 years ago · Published on 26 Jan 2023 7:01PM

‘Toll-free LTU to speed up KL-Kelantan travel when completed in 2026’
Deputy Works Minister Datuk Seri Abdul Rahman Mohamad (right) inspects the progress of the under-construction Lingkaran Tengah Utama Expressway at Seksyen 3J: Kg Seberang Jelai to Kg Relong today. – Bernama pic, January 26, 2023

KUALA LIPIS – A total of two million road users are expected to enjoy the toll-free Lingkaran Tengah Utama (LTU) Expressway, previously known as the Central Spine Road, especially during festive seasons when it is completed in 2026.

Deputy Works Minister Datuk Seri Abdul Rahman Mohamad said that besides being toll-free, the highway would also help speed up travel time from Kuala Lumpur to Kelantan and lead to fuel savings.

“This highway will surely benefit those who carry out business activities and motorists wishing to return to their hometowns during festive celebrations. The LTU will also help traders to transport their goods from Kelantan to Port Klang in a short time,” he told a media conference after surveying Section 3J of the LTU, here, today.

Also present were Pahang Works, Transport, and Health Committee chairman Datuk Mohammad Fakhruddin Mohd Ariff and Datuk Zulkipli Nasri, who is carrying out the duties of the Public Works Department deputy director-general (infrastructure sector).

The LTU is a high-impact project under the Works Ministry which involves six packages from Kelantan to Pahang covering a total of over 300km, with an allocation of RM10 billion.

Section 3J, among others, involves the construction of a new four-lane two-way road along 6.95km from Kg Seberang Jelai to Kg Relong here and the construction of five bridges that are expected to be completed in July 2024. – Bernama, January 26, 2023

Related News

Malaysia / 3y

Pan Borneo Highway: 16 work packages now 75% complete

Malaysia / 3y

38 sick projects identified nationwide: deputy works minister

Malaysia / 3y

Works Dept to vet health facility building contractors to avoid sick projects

Malaysia / 3y

Govt approves RM43 mil to repair flood damage in six states

Sports & Fitness / 4y

Orang Asli have strength, stamina to be world-class athletes: deputy minister

Malaysia / 4y

Govt to meet Orang Asli on Nenggiri hydroelectric dam

Spotlight

Opinion

Can Najib break Madani?

World

Trump offers UFC CEO the position of Press Secretary

Malaysia

Building a great nation begins with happy families, says Anwar

Malaysia

Anwar should sack BN ministers who are not aligned with him – Muhyiddin

Malaysia

AGC rejects claims of defying King’s decree on Najib

Malaysia

Deepavali: Selangor Sultan calls on Malaysians to strengthen unity, reject hatred

Malaysia

If there were still obstacles, why accept the RM50m payment, asks Najib’s daughter

Malaysia

Where did UMNO's RM50 million payment for Najib's release come from?

By The Vibes Says

You may be interested

Malaysia

PLUS highway congested since midnight ahead of Deepavali

Malaysia

Most Malaysian motorists lack flood cover despite rising disaster losses

By Alfian Z.M. Tahir

Malaysia

MOH investigates food poisoning complaints linked to bread product

Malaysia

2 women injured as 2 restaurants catch fire in Brickfields

Malaysia

Bersatu takes swipe at PAS over two-seat contest in Melaka polls

By Alfian Z.M. Tahir

Malaysia

Building a great nation begins with happy families, says Anwar

Malaysia

Ismail dismisses talk of MB succession

Malaysia

If there were still obstacles, why accept the RM50m payment, asks Najib’s daughter