Malaysia

Penang Hill funicular train breaks down twice in two days

Operator says no technical issue to blame, disruption by built-in safety mechanism

Updated 4 years ago · Published on 09 Nov 2021 8:30PM

Penang Hill funicular train breaks down twice in two days
Service disruption causes close to 1,000 people to line up at the top of the hill waiting to get down. – Wikipedia pic, November 9, 2021

by Rachel Yeoh

GEORGE TOWN – The Penang Hill funicular train broke down twice in two days at the beginning of this week – once last Sunday at 1.50pm and yesterday at 10am despite repairs.

Penang Hill Corporation (PHC) general manager Datuk Cheok Lay Leng told The Vibes that the funicular train's operations have resumed this morning after the staff worked throughout the night to repair a potential fault that was detected by the train’s safety mechanism.

“There was no technical issue but the reason the funicular train stopped is due to a built-in safety mechanism. It serves to ensure that the funicular service is always working in tip-top condition.

“When the haul rope was touching the drum underneath the track, which is something that happens due to wear and tear, it sends an error message. When that happens, the funicular train will stop.”

During the service disruption, close to 1,000 people lined up at the top of the hill waiting to get down. However, the emergency response service was quickly deployed to get everyone out of the train and down from the hill as soon as possible.

Cheok said that when the funicular service stopped on Sunday, PHC’s first priority was to get everyone out to safety. The funicular then ran at half the load and half the speed.

With 1,000 people waiting to be transported to the foot of the hill, they managed to get 500 to 600 people down by the funicular and 360 by jeep down to the Penang Botanical Gardens. Only four to five people were ferried by jeep per trip and ten busses were on standby to get the passengers to the Penang Hill lower station.

Despite the delays, we did not receive any complaints. I’d like to think that they were pleased with our quick response despite the delay.

“We had to evacuate everyone before we could do a thorough inspection. The coaches had to be parked at the lower station where the tools and space are available to do troubleshooting.”

Cheok said that it has been two years since the last service and admitted that they need to do better but added that maintenance is conducted every week without fail.

The train coaches are now running with replacement insulators. The new and modern ones from the suppliers in Switzerland are on their way and are set to arrive next week. 

Cheok said that the ones used previously are a decade old.

The funicular train had been running on light load for the past 18 months. 

During the most recent movement control order (MCO) when hikers were permitted to hike up the hill and take the train down, it was only operating at 50% of its full load. When the state borders reopened, it started running at 70% from its full capacity.

Penang Chief Minister Chow Kon Yeow said yesterday that Penang Hill hit 7,000 to 8,000 daily visitors during the recent Deepavali holidays, bringing the number to what it was during the pre-pandemic era. 

Even before the pandemic, the highest number of visitors the hill has ever accommodated was up to 10,000, and it only happens two times a year, at most. – The Vibes, November 9, 2021

Related News

Diary / 10h

Light over darkness – a reminder to champion multi-racialism, says Penang CM

Malaysia / 4d

No special treatment for anyone involved in domestic violence – Penang Exco

Malaysia / 5d

Penang needs to reduce sole reliance on the electrical and electronics sectors – Reezal Merican

Malaysia / 6d

Police open probe into case of Penang assemblyman who allegedly beat wife

Malaysia / 6d

Study on bridge design to replace undersea tunnel underway – Zairil

Events / 6d

Penang Green Summit to focus on use of Artificial Intelligence

Spotlight

Opinion

Can Najib break Madani?

World

Trump offers UFC CEO the position of Press Secretary

Malaysia

Building a great nation begins with happy families, says Anwar

Malaysia

Anwar should sack BN ministers who are not aligned with him – Muhyiddin

Malaysia

AGC rejects claims of defying King’s decree on Najib

Malaysia

Deepavali: Selangor Sultan calls on Malaysians to strengthen unity, reject hatred

Malaysia

If there were still obstacles, why accept the RM50m payment, asks Najib’s daughter

Malaysia

Where did UMNO's RM50 million payment for Najib's release come from?

By The Vibes Says

You may be interested

Malaysia

Abang Johari hints four incumbents will be retained for Sarawak polls

Malaysia

Little activity at Najib’s Langgak Duta home as house arrest remains uncertain

Malaysia

Bersatu takes swipe at PAS over two-seat contest in Melaka polls

By Alfian Z.M. Tahir

Malaysia

If there were still obstacles, why accept the RM50m payment, asks Najib’s daughter

Malaysia

AGC rejects claims of defying King’s decree on Najib

Malaysia

Ab Rauf looks to young voters to shore up BN’s Melaka election bid

By Alfian Z.M. Tahir

Malaysia

Rice supply can last six months, fish for eight; Mat Sabu urges public not to panic

Malaysia

MOH investigates food poisoning complaints linked to bread product